JCM Part No . 960 - 000053R _ Rev . 6 © 2007, JCM - American Corporation 2 - 1 AD - 02 Retrievable Bill Validator Bill Acceptor Series S e c t i o n 2 2   INSTALLATION/OPERATION This section provides installation and operation instructions for the JCM AD - 02™ Retrievable Bill Validator . The information within contains the following features:   Installation   Connection   Operation Installation Perform the following steps to install the JCM AD - 02™ Retrievable Bill Validator unit: 1 . Remove power from host machine . 2 . Mount the unit into your custom customer designed enclosure using the mounting hole dimensions illustrated in Figure 2 - 1, Figure 2 - 2 and Figure 2 - 3 as a guide . Connection The AD - 02™ requires the following three wiring connections as illustrated in Figure 2 - 4: 1 . A 6 - Pin Molex Plug for 24 Volts DC, 10 A Surge (from a user designed power supply) . 2 . A 9 - Pin D Communications Interface Port 3 . A tapped M4 hole chassis earth ground connection point (for grounding strap) . NOTE: AD - 02™ Installati on is relative to a customer’s individual needs and equipment requirements . Figure 2 - 1 End Mounting Screw Hole Locations Figure 2 - 2 Side Mounting Screw Hole Locations Figure 2 - 3 Installation Angular Tolerance ±2° ±2° ±2° ±2°