JCM Part No . 960 - 000053R _ Rev . 6 © 2007, JCM - American Corporation 2 - 7 Installation/Operation AD - 02™ Retrievable Bill Validator Section 2 8 . To access the Base Unit Open/Close Compo - nent Assembly area (#12), proceed as follows: a . Remove the two (2) M3 Phillips Screws (See Figure 2 - 24) . b . Tip the assembly forward (See Figure 2 - 25) . c . Carefully remove the Open/Close Component Assembly from the frame (See Figure 2 - 26) . 4 . If a bill jam error occurs during a dispersal function, it could exist in the Temporary Stacking area or in the Bill Presser area of the Stacker . First open Door #7 located on the left side of the machine to see if a jammed bill exists in the Temporary Stack - ing area . Turn the Green wheel to move the bill forward or backward on the belt for easier removal (See Figure 2 - 27 a, b & c) . 5 . Now rotate the actuator knob to move the Bill Presser up or down in case the jam is in the Bill Presser area ( See Figure 2 - 28) . Figure 2 - 24 Removing M3 Screws Remove M3 Phillips Screws Figure 2 - 25 Removing Assembly Tip Assembly Forward Figure 2 - 26 Component Assembly Removed Remove the Component Assembly Figure 2 - 27 Accessing Temporary Stacking Area Open Door #7 a Remove Bill Jam & Reclose Door b Rotate the Green Wheel to Move the Bill Position for Access c Figure 2 - 28 Accessing The Bill Presser Area a Rotate Knob to Raise or Lower Presser Bill Presser Belt