JCM Part No . 960 - 000053R _ Rev . 6 © 2007, JCM - American Corporation 4 - 1 2 Section 4 AD - 02™ Retrievable Bill Validator Disassembly/Reassembly 4 . Remove the Dispensing/Loading Branch Solenoid TDS - 06U - 13 from the assembly ( See Figure 4 - 39 d) . Transfer Guide Removal 5 . Remove Drive Belt A from the upper section of Stacking Pulley #1 ( See Figure 4 - 40 a) . 6 . Remove Drive Belt B from the lower section of Stacking Pulley #1 (See Figure 4 - 40 b) . 7 . Remove the Stacking Pulley #1 shaft locking E - ring ( See Figure 4 - 41 a) . 8 . Remove Upper Stacking Pulley #1, Locking Pin #1, Dispensing Pulley Collar #2, Collar #3, and the 25 Tooth Gear ( See Figure 4 - 41 b), then 9 . Remove Locking Pin #2 (See Figure 4 - 41 c 1 ), then 10 . Remove lower Stacking Pulley #1, and 11 . Remove Locking Pin #3 from the Stacking Pulley Drive Shaft ( See Figure 4 - 41 c 2 & c 3 ) . Entrance Roller and Rubber Feed Roller Removal Perform the following steps to remove the AD - 02™ Entrance and Rubber Feed Rollers: 1 . Remove the two (2) Entrance Roller shaft locking E - rings and their two (2) related shaft Bearings ( See Figure 4 - 42 a 1 & a 2 , b 1 & b 2 ) . a) b) Figure 4 - 40 Dispensing Unit Drive Belt Removal a) c 2 ) c 3 ) b) c 1 ) Figure 4 - 41 Stacking Pulley #1 Parts Removal d) c) a 2 ) a 1 ) b 1 ) b 2 ) Figure 4 - 42 Transfer Guide 6 Removal