JCM
Part
No
.
960
-
000053R
_
Rev
.
6
©
2007,
JCM
-
American
Corporation
6
-
1
3
Programming
and
Testing
AD
-
02
Retrievable
Bill
Validator
Section
6
Counting
Sensor
(See
Figure
6
-
34
c
for
location)
.
2
.
Press
Switch
SW2
to
begin
the
test
(
See
Figure
6
-
33
h)
.
The
unit
will
make
the
necessary
adjustment
and
then
displays
2yPo
(
See
Figure
6
-
33
i)
.
U
NIT
O
NE
C
OUNTING
S
ENSOR
ADJUSTMENT
To
initiate
a
Unit
One
Counting
Sensor
adjustment
proceed
as
follows:
1
.
Insert
Yupo
#80
Calibration
Paper
between
the
transmitter
and
receiver
of
the
Unit
One
Counting
Sensor
(
See
Figure
6
-
34
d
for
location)
.
2
.
Press
Switch
SW2
to
begin
the
test
(
See
Figure
6
-
33
j)
.
The
unit
will
make
the
necessary
adjustment
and
then
displays
1yPo
(
See
Figure
6
-
33
k)
.
D
IRECT
B
EAM
C
OUNTING
S
ENSOR
ADJUSTMENT
To
initiate
a
Direct
Beam
Counting
Sensor
adjust
-
ment
proceed
as
follows:
1
.
With
NO
Calibration
Paper
inserted
between
the
transmitter
and
receiver
of
the
any
Counting
Sensor
Units,
press
Switch
SW2
(
See
Figure
6
-
36
c)
.
E
NDING
T
HE
C
OUNTING
S
ENSOR
ADJUSTMENT
Once
all
of
the
sensor
adjustments
are
completed,
the
acquired
data
will
be
written
into
memory
by
pressing
SW2
until
End
is
displayed
(See
Figure
6
-
36)
.
Test
#9
Communication
Loopback
Test
Test
#9
provides
a
loopback
test
to
determine
the
functionality
of
the
serial
communication
port
.
To
conduct
the
Communication
Loopback
Test
proceed
as
follows:
1
.
Short
-
circuit
transmit
and
receive
pins
2
&
3
of
the
communication
port
as
illustrated
in
Figure
6
-
37
a
.
2
.
Press
Status
Switch
SW1
to
advance
to
Test
#9,
the
Communications
Loopback
Test
(
See
Figure
6
-
37
b)
.
3
.
When
T9
is
displayed,
Press
SW3
to
begin
the
test
(
See
Figure
6
-
37
c)
.
Data
will
contin
-
uously
be
transmitted
in
intervals
of
approxi
-
mately
0
.
5
seconds
bursts
.
4
.
End
the
test
by
pressing
Status
Switch
SW1
again
(
See
Figure
6
-
37
d)
.
Remove
the
short
between
pins
2&3
.
Figure
6
-
35
Direct
Beam
Count
Sensor
Calibration
Adjustment
Once
the
unit
displays
1bPo
following
comple
-
tion
of
the
Unit
One
adjustment,
and
ST
is
again
displayed.
Press
SW2
to
begin
the
Direct
Beam adjustment
procedure
The
unit
will
display
CLr
when
the
Direct
Beam
adjustment
procedure
is
complete
.
b
c
d
a
S
T
C
L
r
NOTE:
Make
sure
that
no
object
blocks
the
Base
Unit,
Unit
1,
Unit
2
or
Unit
3
Counting
Sensors
when
performing
the
next
step
.
1
y
P
o
E
n
d
Figure
6
-
36
Ending
The
Count
Sensor
Procedure
Figure
6
-
37
Loopback
Test
Procedure
Press
SW1
to
Locate
Test
Press
SW3
to
Begin
Test
b
c
d
Transmitting
Data
a
Press
SW1
to
End
Test
Short
Pin
Name
Function
1
NC
Unused
2
RD
Receive
Data
3
SD
Transmit
Data
4
NC
Unused
5
SG
Signal
Ground
6
NC
Unused
7
NC
Unused
8
NC
Unused
9
NC
Unused
S
Female
Port
Data
is
transmitted
at
intervals
of
approximately
0
.
5
seconds
.
Remove
the
short
between
pins
2&3
.
h
o
r
t
T
9