JCM Part No . 960 - 000058R _ Rev . 2 © 2008,   JCM - American Corporation 1 3 EBA - 03 Bill Validator Bill Acceptor Series S e c t i o n 4 4   CALIBRATION VM - 450 and EBA - 03 DIP Switch Settings Figure 4 - 3 illustrates the VM - 450 and the EBA - 03 proper test DIP Switch settings . When power is applied to th e VM - 450, the Red and Green LEDs on the EBA - 03 will light . This means the unit is in Standby Mode . Tests and adjustments are performed in this mode . If the LEDs fail to light, recheck the DIP Switch setting s . Turn power to the VM - 450 OFF, then turn it back ON . If the LEDs still do not light, check the ROM and CPU Board’s integrity . Installing the Calibration Software 1 . Place the EBA - 03 calibration software CD into your CD drive . Wait a few seconds, and the first screen shown in Figure 4 - 4 will appear . 2 . Once the files are copied, the second screen shown in Figure 4 - 5 will appear . Connecting a PC for Calibration Figure 4 - 1 illustrates the required equipment inter - connection necessary to properly calibrate the EBA - 03 unit . Figure 4 - 1 EBA - 03 Test Setup Figure 4 - 2 illustrates the required tools necessary to properly calibrate the EBA - 03 unit . Figure 4 - 2 EBA - 03 Test Tool Requirements Figure 4 - 3 VM - 450 and EBA - 03 DIP Switches Figure 4 - 4 Initial Software Install Screen