JCM Part No . 960 - 000076R _ Rev . 1 © 2007, JCM - American Corporation 4 - 1 0 Section 4 World Bill Acceptor (WBA® - 1x/2x - SS & SS2) Disassembly/Reassembly 3 . Remove the single (1) locking pin below the large gear (See Figure 4 - 36 b) . 4 . Remove the two (2) shaft securing E - rings and the two (2) Bushings from the shaft ( See Figure 4 - 36 c) . 5 . Remove the Shaft Tension Spring set on the small drive gears shaft end (see f inset) on the shaft . ( See Figure 4 - 36 d) . 6 . Separate the Cash Box side and remove the two (2) Timing Belts ( See Figure 4 - 37 a & b) . The WBA Disassembly Procedure is now complete . Reverse all of the proceeding instructions to reassemble any of the components described during this disassembly procedure . a) a) c) c) b) d) a) c) Figure 4 - 36 Pusher Mechanism Gear Removal a) b) Figure 4 - 37 Pusher Mechanism Belt Removal